# Easy-Docker Development Team Process
## Purpose
This document defines the working model for the easy-docker team.
Focus is process, responsibilities, and execution flow for ongoing refactoring and feature work.
## Team Setup
- Lead Developer
- Owns scope, priorities, and release decisions.
- Resolves conflicts between technical proposals.
- Approves final merge readiness.
- Senior Developer A (Correctness)
- Reviews control flow, edge cases, and failure behavior.
- Validates data handling, state transitions, and rollback paths.
- Checks defensive programming and explicit error handling.
- Senior Developer B (Architecture)
- Reviews modularity, coupling, and naming consistency.
- Drives DRY/KISS refactors and shared helper extraction.
- Validates maintainability and testability.
- Implementation Developer
- Delivers code changes according to approved scope.
- Keeps behavior stable unless change is explicitly requested.
- Adds/update docs for structure and flow changes.
- QA/Verification Owner
- Runs pre-commit and targeted checks.
- Executes reproducible manual test matrix for wizard paths.
- Reports pass/fail with concrete reproduction steps.
## Working Agreement
- No hidden behavior changes during refactors.
- Source-of-truth decisions must be explicit and documented.
- New code must prefer existing helpers over duplicated logic.
- Every change batch must be reviewable by concern (flow, env, compose, ui).
## Daily Process (Tomorrow Plan)
1. Kickoff (15 min)
- Confirm target scope for the day.
- Confirm "no functional change" boundaries.
- Assign owners for implementation and verification.
2. Design sync (20 min)
- Compare at least two technical options for non-trivial edits.
- Select one approach with short tradeoff note.
3. Implementation blocks
- Work in small vertical batches (one concern per batch).
- Keep public function contracts stable where possible.
- Update docs in the same batch when structure changes.
4. Review blocks
- Senior A reviews correctness and failure paths.
- Senior B reviews architecture and maintainability.
- Lead resolves conflicts and accepts/rejects batch.
5. Verification block
- Run pre-commit for changed files.
- Run targeted manual flow checks.
- Record results in short checklist format.
6. Handover
- Write what is done, what is pending, and next first task.
- List any blockers with owner and proposed resolution.
## Implementation Workflow
1. Define scope and constraints.
2. Map affected files/functions.
3. Propose options and select approach.
4. Implement with small commits by concern.
5. Validate with checks and manual path coverage.
6. Document final state and next steps.
## Review Workflow
1. Findings-first review format.
2. Severity order: BLOCKER, HIGH, MEDIUM, LOW.
3. Each point must include file reference and reason.
4. Lead decision:
- Approved
- Approved with conditions
- Not approved
## Test and Verification Matrix (Minimum)
- Create new production stack and complete wizard.
- Create new development stack and complete wizard.
- Manage existing stack:
- Apps -> Generate apps.json
- Apps -> Select apps and branches
- Docker -> Generate docker compose from env
- Docker -> Start stack in Docker Compose (single-host topology)
- Abort/Back paths:
- Back navigation in each submenu
- Abort wizard with rollback
- Validation paths:
- Domain validation error then correction
- Branch selection from apps catalog (including back-navigation)
## Definition of Done (Team)
- Scope completed with no unplanned behavior change.
- No avoidable duplication introduced.
- Review completed by both senior roles.
- Lead verdict documented.
- Verification evidence recorded.
- Handover notes prepared for next workday.
## Handover Template
Use this at day end:
```text
Date:
Completed:
- ...
In Progress:
- ...
Next First Task:
- ...
Blockers:
- <owner> - <issue> - <proposed action>
Verification:
- pre-commit: <pass/fail + note>
- manual matrix: <pass/fail + note>
```